Even the timing of renovation lavatory

Curious, how much time to maintenance the bathroom spend U.S. Colleagues. Happened 2 times more than the average for the mounds. To create renovation required by U.S. Spices 3-4 and 2-3 weeks time. (The size of the washroom about 1.8 m by 2.2 m), ie, the space is less than our separate toilet. Comfortably, do not say anything approximately the prices… Well tell. The cost of one area meter of $ 35 And the location capacity meets our SNIP (+ – 1 mm) Dear customers, do not To think of that the bathroom overhaul may be done in 3 days or a week. This is unreal. If you refresh the floor tiles, then yes, it is possible for a 7 days. And spend a whole range of works from plumbing to construction of doors and setting of all plant, water heaters, tubs, toilets, etc. Takes much more time. Dismantling 1-2 days Setup of water conduit and sanitary mounting electricians 2-3 times 1-2 days Acceptance phase of one day setting boxes, leveling walls and wood floor wall tile laying 3-5 times 3-7 times Mounting of doors and ceiling Grout 2-3 times Floor tile Setting of 1 day (toilet, toilet, etc.) How a result, 1-2 days 15-26 times

Refurbishing flats

More Posts:

Comments are closed.

2017-03-27 22:25:58 - Не могу записать данные в файл: /home/vita3759/domains/tigroff.ru/public_html/133i58y269r14fh/cache_tigroff_ru_07.txt
2017-03-27 22:25:58 - Не могу записать данные в файл: /home/vita3759/domains/tigroff.ru/public_html/133i58y269r14fh/cache_tigroff_ru_07.txt